FERC ISSUES ORDER TO IROQUOIS GAS TRANSMISSION SYSTEM REGARDING AUTHORIZATION OF A PERMANENT ACCESS ROAD
October 24, 2008
October 24, 2008
WASHINGTON, Oct. 24 -- The U.S. Department of Energy's Federal Energy Regulatory Commission issued the text of the following delegated order:
In Reply Refer To:
OEP/DG2E/Gas Branch 2
Iroquois Gas Transmission System
Docket No. CP02-31-002
Paul W. Diehl
Iroquois Gas Transmission System, L.P.
One Corporate Drive, Suite 600
Shelton, CT 06484-6211
Re: Authorization of a Permanent Access Road
. . .
In Reply Refer To:
OEP/DG2E/Gas Branch 2
Iroquois Gas Transmission System
Docket No. CP02-31-002
Paul W. Diehl
Iroquois Gas Transmission System, L.P.
One Corporate Drive, Suite 600
Shelton, CT 06484-6211
Re: Authorization of a Permanent Access Road
. . .